Passive Fire Protection

Documented Fire Stopping Works PAL-Trained Personnel

Installation and remedial passive fire-stopping works carried out to the specified tested system detail, with product information, installation photographs and location-based records.

PAL Centre Training Nullifire Product Training Photographic Records Tested-System Details
Accreditation disclosure

Meath is not a BM TRADA third-party certified fire-stopping installer and does not represent its work as BM TRADA certified or independently self-certified. Where a contract requires a particular third-party certification scheme, this must be identified before appointment and may require an appropriately certified specialist.

TRAINING & TRANSPARENCY

Product training supported by installation records.

Personnel have undertaken passive fire-stopping theory and practical training through the Performance Adhesives Ltd Centre of Excellence, including training relating to Nullifire systems.

Fire stopping must follow the tested application

A fire-stopping product cannot be selected from appearance alone. The supporting construction, service type, opening size, insulation, annular gap, required rating, orientation and fixing arrangement must fall within the relevant tested or assessed system.

Meath works from the project fire strategy, approved specification, manufacturer detail or other competent design information supplied for the installation.

Typical Works

Passive fire-stopping installation and remediation

Availability depends on the supplied design, tested-system evidence, existing construction, access and inspection requirements.

01

Service Penetration Seals

Specified sealing arrangements around suitable pipes, cables, trays and other services passing through fire-resisting elements.

02

Coated Fire Batt Systems

Installation or remediation of compatible coated-batt systems where the complete detail is covered by the specified evidence.

03

Fire-Rated Sealants

Application of specified intumescent or fire-resistant sealants to suitable penetrations and linear joints within tested limits.

04

Collars & Wraps

Installation of the specified pipe closing device using the required orientation, fixings, substrate and supporting seal.

05

Fire Mortar

Specified mortar systems for suitable wall or floor penetrations, subject to opening size, construction and service requirements.

06

Remedial Fire Stopping

Removal and replacement of identified defects where a compliant tested detail has been selected for the actual condition.

Installation records

Documentation is agreed for the project and can be structured around individual fire-stopping locations.

Unique location or penetration reference
Building, level, room or grid location
Before and after photographs
Service and substrate description
Product and system reference
Required fire rating supplied
Installation date and operative record
Recorded limitations or observations
DESIGN RESPONSIBILITY

Correct detail before installation.

Meath does not replace the project fire engineer, fire-stopping designer, responsible person, building control function or independent inspector. Design responsibility, required performance and acceptance criteria must be clear before work proceeds.

Delivery Process

A controlled route from survey information to handover

STAGE 01

Information

Receive the fire strategy, survey, drawings, schedule and rating requirements.

STAGE 02

Detail

Confirm the specified tested system and its suitability for the actual condition.

STAGE 03

Prepare

Check access, opening, services, substrate and required supporting work.

STAGE 04

Install

Complete the work to the current manufacturer and project requirements.

STAGE 05

Record

Compile agreed photographic, product and location information for handover.

Information required for pricing

Provide the site address, building type, fire strategy, survey or penetration schedule, drawings, required ratings, photographs, system specification, inspection requirements, access restrictions and programme.

When third-party certification is required

Some clients, insurers, specifications or procurement routes require installation by a contractor certified under a named third-party scheme. Meath will not describe PAL or product training as equivalent to BM TRADA certification.

If the specified certification is mandatory, the delivery route must be agreed before work is offered or instructed.

Related Services

Supporting Meath construction services

Do you have a fire-stopping schedule or survey?

Send the project information, tested-system details, photographs, required records and programme for review.

Discuss a Project