Construction Services

Asbestos Removal Coordination Licensed Partners & Assessed Non-Licensed Work

Survey-led asbestos removal coordinated with strip-out, alteration and reinstatement requirements. Licensed work is delivered through an appropriately licensed partner company.

Survey-Led Scope
Licensed Partner Delivery
Non-Licensed Work
Controlled Handover
SCOPE CLASSIFICATION FIRST

The material and task determine who may undertake the work.

Every enquiry is reviewed against the asbestos information, material condition, proposed activity and applicable control requirements before a scope is accepted.

The correct delivery route for every assessed scope

Meath coordinates licensable asbestos work through an appropriately licensed partner company. Assessed non-licensed work may be undertaken using trained personnel and task-specific controls.

Some non-licensed work is notifiable and carries additional requirements. Work proceeds only after the correct category, contractor, controls, plan, competence and waste arrangements have been established.

ASSESSED WORK TYPES

Licensed partner removal, non-licensed work and reinstatement

Every work type remains subject to the survey, material condition and task-specific assessment. The resulting classification determines whether Meath's trained team or an appropriately licensed partner undertakes the removal.

01

Licensed Partner Removal

Licensable asbestos removal delivered through an appropriately licensed partner company and coordinated with the wider project programme.

Send the Survey →
02

Asbestos Cement Products

Assessed removal of appropriate asbestos cement sheets, panels, gutters or similar bonded products where the task remains non-licensed.

Explore Roofing & Cladding →
03

Floor Tiles & Bituminous Materials

Controlled removal of applicable asbestos-containing floor tiles, mastics, felts or bituminous products within an agreed non-licensed scope.

Explore Finishing Packages →
04

Textured Coatings

Assessed work involving appropriate textured coatings using task-specific controls and methods suited to the area and substrate.

Explore Plastering & Rendering →
05

Associated Strip-Out

Coordination of surrounding non-asbestos strip-out after the asbestos scope, sequence and safe boundaries have been confirmed.

Explore Commercial Strip-Out →
06

Reinstatement & Making Good

Building repairs and reinstatement planned after removal, clearance and any required confirmation that the area may be handed back.

Explore Remedial Works →

What to send for assessment

Asbestos survey or register
Sample and analysis results
Material locations and quantities
Photographs and condition
Proposed work and programme
Access and occupation details
A refurbishment or demolition survey may be required before intrusive refurbishment or demolition. Suspect materials must not be disturbed until suitable information and an appropriate contractor are in place. Read the HSE survey guidance →
CONTROLLED DELIVERY

Plan, controls, waste route and handover agreed before work.

The required risk assessment, plan of work, equipment, personal protection, decontamination, waste handling and emergency arrangements must reflect the confirmed task category.

Need an asbestos scope assessed?

Send the survey, photographs, location, proposed work and required programme.

Discuss a Project